
Vectorworks student space tool how to#
“We worked closely with the structural engineer to consider how that might be done, such as how to refurbish the building later on down the line,” said Lizzie Dodwell, an architect at bpr. The building also needed to be adaptable to meet continually changing teaching, accessibility, and sustainability requirements, both immediate and for the future. First, the building would be constructed on a vacant part of campus composed of a steep, grassy bank. Several challenges arose when bpr started working on the Ritterman Building design. A client for more than 12 years, the university trusted that bpr had a solid understanding of its needs and how to accomplish them through good design. Such was the case when working with Middlesex University.

“As a designer you are always looking for opportunities where you can add value through good design, not just for the betterment of the project, but for the betterment of the environment around that project – strategic solutions that benefit the wider estate.” said Beaty-Pownall. The team selected a pilot project for this task: the Ritterman Building, a five-storey teaching space for long-standing client, Middlesex University. With this framework in place, bpr implemented BIM Level 2 standards into its workflow with teams combining design information with their models to create a federated BIM model. I decided that all future work will be in 3D, and we will make better use of models that can produce information more efficiently.” – Paul Beaty-Pownall In 2013 we changed our working practices and workflow so projects are drawn in 3D from conception. “We took advantage of the UK’s regulatory regimes to move to BIM.
Vectorworks student space tool software#
As part of its compliance strategy, bpr began using Vectorworks software almost exclusively to maintain consistency across projects.


In response to the UK government mandate for the use of 3D BIM on all public projects by 2016, bpr moved quickly to keep pace with the requirements. Led by Directors Paul Beaty-Pownall and Steve Cowell, the firm specialises in three core sectors: higher education, rail stations, and regeneration. This medium-sized, employee-owned firm based in the UK focuses on how good design can add value to a client’s vision. A separate dye room facilities located in the adjacent building include a newly renovated, stainless workspace, and an additional room housing 3 washers, a stainless dye steamer and dying machine.Working in BIM enables bpr architects to create world class buildings for Middlesex Universityįor bpr architects, BIM Level 2 is becoming business as usual. Double-hanging wardrobe storage areas in the center of the room are surrounded by floor-to-ceiling box and shoe storage. Adjacent to the costume shop is a 16’ tall, 936-square-foot costume storage area. The main room features built-in cabinet and drawer storage for jewelry, trim and craft/findings. Cutting areas include one 20’ x 4’ main cutting table along with one 4’ x 6’ and two 4’ x 8’ cutting tables. Additionally, the shop contains 3 industrial irons located in 2 ironing areas.

The shop contains 7 industrial sewing machines, 4 over-lock / serger machines, and 15 home machines, and 2 industrial irons. Encompasses 2,000-square-foot, multi-room facility located in the basement level of the building, and features an entire wall of windows, allowing for plenty of natural light.
